Benchmarks
MIMO Sine Suite
Several shakers holding an amplitude and a phase at every control gauge as the tone sweeps, dwells or steps, on structures whose resonances move with level.
This suite is being built. It is not released and has no problems or scores yet. When it is, its problems will be on their own DOI and its scorecards on Scorecards, in the same form as the MIMO Random suite's.
The Problem
A sine test is controlled through a model of the article measured at a low level before the test. Near a lightly damped resonance the response changes quickly with frequency, so a sweep gives the control loop very little time at the one place it matters most. On a real article the resonances also move as the level rises, and then the model is wrong exactly where the tone needs it.
What is published is thin: Multi-Shaker Sine Control: What Is Published, and Where It Stops found the published multi-shaker laws tested on one two-axis table, two beams, one simulation and one run-to-run method, and none on a structure whose resonances move with level. No standard it read sets a phase tolerance for several exciters.
What It Will Hold
The same program as every suite of the set:
- a structure on several shakers, with control gauges and held-out gauges, and the stress in every element where the model allows it;
- targets for a sweep, a dwell and a stepped sine, with an amplitude and a phase at each control;
- a stage 1 on which the article is linear and a stage 2 on which its joints soften and a member hardens, on the same structures;
- the limits of a fair run, among them the sweep rate, which decides how hard a resonance is to follow;
- one published scorer and a scorecard, not a verdict;
- the scorecard of every MIMO Sine control law that ships with Hertzforge, as the baselines.
What a Run Will Be Scored On
- the amplitude and phase error at each control gauge along the sweep, not only at its end;
- the worst over-test on the way through each resonance, because an over-test at one frequency is still an over-test;
- the held-out gauges and the stress, against the article in service;
- at stage 2, how far the resonances moved during the run, beside how far they move in service.
These are the intentions. The scorecard is fixed when the suite is released, and may change before then.
The laws that ship today are in the control law catalog, and their limits on Known Limits.