Skip to content

Classical Shock

Classical shock fires one pulse at a time, of a standard shape such as a half-sine, at a set peak and duration, and closes the loop between pulses: after each pulse is measured and judged, the control law proposes the next drive and the controller checks it before it plays. The drive is in volts throughout, held under a drive ceiling and an abort that the operator gives.

This guide is written for the test engineer running the test. It follows the order of a run: the station and channels, the pulse, the standard, the schedule, identification, control and limits, trains and the run's record, then the run itself. Classical shock shares its run bar, station panel, channel table and control-law panel with Random and MIMO Random, so an engineer who has run one will find the others familiar.

What the Test Does

A run goes through these steps in order:

  1. Arm. The station opens, adopts its sample rate and passes its gate. Nothing is driven. When a shaker is given, the pulse is checked against its ratings first; a pulse over them blocks the run until the operator arms past it in their own words.
  2. Identification. Band-limited random at a stated drive in volts rms, its peak held under the drive ceiling. The controller estimates how the system answers (its frequency response and coherence) on the pulse's own grid, and marks the lines it trusts. A mean coherence under the floor, or trusted lines that cover too little of the reference, holds the run before any pulse.
  3. Review. With the review hold on, the run waits with the identified system on screen. Nothing fires until the operator proceeds.
  4. Seed. The control law builds the first drive from the identified system. The controller predicts the full-level drive and its response; a drive predicted over the drive abort ends the run before anything fires.
  5. Pulses. For each pulse: check the drive (its volts, its predicted peak and kinematics, at rest at both ends); bring the station up with the pulse loaded; wait out the time between pulses; start it; measure and judge it against the standard; let the law propose the next drive; check the law's drive; move the ladder.
  6. End. The schedule completes, or the run stops, aborts, fails to converge, or the law gives no usable drive.

The law works at full level. Every drive it proposes is checked by the controller before it plays, whichever law it is.

Opening the Test

In Acquire & Control, choose Classical Shock from the test types. The screen has two steps, Setup and Run. The run bar (where the data comes from, the run's state, elapsed time, level, the pulses fired and passed, who holds control, and Stop and Abort once a run is live) stays in view on both. The setup's sections are tabs; the summary beside every section says what the setup holds, what the control service worked out from it, and what is still missing, each a click from its section.

Proceed to Run applies the setup (with any channel table edits first) and shows the run. Start arms if needed, then runs identification. The setup is checked as it is edited: every problem shows in the section it belongs to, and a setup with errors is never accepted.

Station and Channels

The station panel chooses the simulator or the NI hardware, as for Random. The run controls on the channel table's first enabled control row and drives its first enabled drive row; the section names both. Any other enabled row can be monitored (Limits).

The Pulse

  • Shape: half-sine, haversine, terminal-peak or initial-peak sawtooth, trapezoid (with its rise and fall as shares of the duration) or rectangle.
  • Peak in g and duration in ms, at full level.
  • Direction: positive or negative. The standards ask for both directions; negative turns the reference over and the pulse is judged on the same terms.
  • Compensation. A shaker cannot end a pulse still moving. Shoulders before and after the main pulse take the velocity and the displacement back to zero. Their shape is rectangular, rounded rectangular or half-sine, and their length a multiple of the duration, the same both sides or set apart. The usual choice is rectangular shoulders four times the duration.

Beside the pulse, the control service draws it at full level: the reference with its tolerance band, its velocity and displacement, the velocity change, the peak-to-peak displacement, and how far the shoulders reach into the standard's quiet window. Shoulders that leave the quiet window are a warning, not an error: the test may run, and longer, lower shoulders bring it inside.

The Standard

  • Judged by MIL-STD-810, Method 516 (amplitude within 15% of the peak around the reference, velocity change within 10%) or IEC 60068-2-27 (20% and 15%).
  • A failed pulse aborts at full level only (below it, the run raises an alarm and the law corrects the next pulse), or at every level. A pulse that comes in low never aborts by itself; the limit on tries at one level ends a run that does not converge.
  • Overshoot abort: a measured peak over the commanded peak by more than this share aborts at any level. Usual: twice the standard's amplitude tolerance.
  • Measurement: the sample rate asked of the station (the run reports the rate it used), and each pulse's shock response spectrum (SRS), its band, bands per octave and an informational band about the reference's SRS. The SRS is shown on its own page; the run is judged on the pulse.

The Schedule

  • Automatic fires the schedule by itself, level by level. Manual waits for Fire; the operator steps the level, goes to a level of the table, and fires trains and bursts. The mode is fixed for the run.
  • Levels: from the first level to full level, 0 dB, the last, each with its pulses.
  • When a level is done: on passing pulses (the usual choice: the law keeps correcting until a level's pulses pass, and too many tries at one level end the run as not converged), or after its pulses, passed or not.
  • Time between pulses: at least the largest of the cooling, settling and computing times, from the moment the station starts one pulse to the moment it starts the next. It also sets the control law's time budget, a share of it.

Identification

The drive level in V rms (its peak is held under the drive ceiling), the length, the block length of the estimate, the band, the mean coherence it must reach, and the review hold. With the review hold on, the run waits after identification with the identified system on the Identification page; Proceed in the run bar goes on.

Control

The control law panel lists the laws of the classical world from the control service: the built-in law first, then imported law files. It shows the chosen law's author, file hash, check record and whether it may drive hardware, and its parameters, drawn from the law's own manifest. Import Law reads a law file by its full path on the computer that runs the test. An imported law runs on the simulator at once; it drives hardware only once its check has passed. The law and its parameters are fixed for the run.

What the correction trusts: its band, the coherence floor (a line is corrected only where identification measured it well), the inverse floor, the reference floor, and the share of the reference's energy the trusted lines must cover.

Guards the controller holds every law to: the time budget of a call and the misses in a row that stop the run (a miss fires the drive in force again), the run's pulse cap, the caps on the drive's peak and on any line's rise from one pulse to the next at full level, the first drive's bound, and the pulses in a row with a growing error that end the run.

Limits

  • Drive ceiling and drive abort, in volts peak at the amplifier's input. There is no default for either; give the values for your amplifier. A drive over the ceiling is scaled down to it, and the run says so. A drive predicted over the abort is never played: the run aborts first.
  • Peak acceleration ceiling: a predicted response peak over it scales the pulse down before it fires.
  • Monitored channels: any enabled row with a peak ceiling, checked after each pulse or predicted before it. A monitor over its ceiling aborts the run.
  • Shaker and moving mass: the shaker record, the moving masses and the residual velocity and displacement the pulse may leave. Checked at arm; the shaker's ratings are also the run's kinematic aborts. Without them, feasibility is not evaluated and the run says so.

Trains and the Run Record

On the manual ladder, a train fires a count of pulses at the present level, at least the time between pulses apart (its first pulse too, from the pulse before it), and a gunfire burst fires rounds at a rate. Each fires the drive in force, with no law call inside it, and every pulse is judged. Fields kept with the run (a run number, an operator) are listed here.

Every run is recorded in a run folder from the moment it arms, as a Random run is (docs/run-folder.md, "What a Classical Shock Run Saves"). The Run Record panel takes the operator, the test article, the specification document and clause, and notes, and whether the folder keeps the time histories: every enabled input and the drive, a shot for identification and one for each pulse. With them off, the setup, the table, the log and every pulse's results are still kept. A run whose folder cannot be written does not arm, and says which folder and why. Once armed, the Run card names the folder; when recording has a problem the card says so and the run goes on. A finished run's end line offers Open in Analysis, which converts the folder and opens its data in the Shock workspace (each pulse's time history and SRS, the reference SRS and its band, the identification), and Copy Folder Path. The run has no capture of its own any more: the run folder is the one record.

The Run

The run bar carries the verbs that apply now: Apply Setup, Arm, Start, Proceed at the review hold, New Run once a run has ended, and Stop and Abort, which any connected screen may use. Stop lets the pulse in flight finish and fires nothing more; Abort takes the drive down at once. On the manual ladder the bar adds Fire, a 1 dB step down and up, Go to level, Train and Burst. A verb that cannot run says why when it is focused or hovered: "The next pulse may fire in 0.6 s", "A pulse is playing", "At the last level of the table".

The level card beside the pages says what the run is doing in plain words ("Pulse 3 of 7 at -6.0 dB", "Next pulse in 0.6 s", "Holding for review"), how the last pulse went ("Pulse 2 was 25% low; correcting", "Pulse 4 passed, 1.9% error"), its commanded and measured peak, error, velocity change and drive, its three verdicts (envelope, velocity change, substitution), and the predicted full-level drive against the ceiling and the abort. When the run ends, the card says how, and for a protection what tripped and on which pulse; a trip found on the prediction says that nothing was driven for it.

The pages, each drawn from the control service's views:

  • Pulse: the reference at the level fired with its tolerance band, the measured pulse and the drive played.
  • SRS: the measured pulse's SRS against the reference's, with the informational band.
  • Kinematics: velocity and displacement, measured and reference.
  • Identification: the identified system's magnitude, and the coherence with the trusted lines marked; the pulse's spectra.
  • Pulses: every pulse fired: where it came from, its level, drive, peak, error, velocity change, verdicts, result, SRS bands and the law call that made its drive. Pick pulses here (up to six) to lay them over the Pulse and SRS pages.
  • Law: the control law's reported values on its last call, and the run in numbers.

Pages can be added, renamed and removed, and a page opens in a window of its own for another monitor; every window keeps Stop and Abort, and Cmd or Ctrl and period aborts from any of them.

When nobody holds control, firing pauses at once. A screen that takes control within the timeout resumes the run; otherwise it ends with a safe stop.

How a Run Ends

Outcome Meaning
Completed The schedule finished
Stopped by the operator Stop: the pulse in flight finished, nothing more fired
Aborted by the operator Abort
Stopped: nobody held control No screen held control for the timeout, or the service shut down
Aborted by a protection Tolerance, overshoot, kinematics, drive, peak acceleration, a monitor, or a growing error
Stopped: the pulse did not converge Too many pulses at one level without a pass, or the run's pulse cap
Held at identification The coherence, or the trusted lines' share of the reference, was too low
Stopped: no usable drive from the control law The law missed too many calls in a row, or its first drive was refused